In a blog post, Musk said the acquisition was warranted because global electricity demand for AI cannot be met with “terrestrial solutions,” and Silicon Valley will soon need to build data centers in space to power its AI ambitions.

This dumb fuck. Unfortunately, his boosters will be all-in on this messaging. Whatever.

  • bebabalula@feddit.dk
    link
    fedilink
    English
    arrow-up
    3
    ·
    13 hours ago

    Some back of the envelope: An ideal black-body at 100 C will radiate something like a kW pr m2, give or take. So one h100 at 700W(?) would probably need a reflector of around one m2. Very rough but it’s probably within an order of magnitude so it’s not impossible, but just adds to the engineering and logistics challenges.

    • humanspiral@lemmy.ca
      link
      fedilink
      English
      arrow-up
      2
      ·
      8 hours ago

      Very expensive solar and radiative panels. Need 3x radiator area to solar. Also need to launch them