• Leon@pawb.social
    link
    fedilink
    English
    arrow-up
    0
    ·
    2 days ago

    I can believe this. I’ve been put on slop duty, and had the slopmachine go all

    Time to run the test to ensure everything is good. It passed. Good. Let’s run the entire suite to ensure no regressions. All tests passed, yay.

    And I’m here thinking, if you’re gonna run the whole suite anyway, why’d you run an individual test? That’s just redundant.

    • shiftymccool@piefed.ca
      link
      fedilink
      English
      arrow-up
      0
      ·
      16 hours ago

      It’s pretty much what i do when i think i’m done. Run the test(s) for the stuff i touched, then the whole suite to make sure nothing else broke. Why would i take all that time to run the whole suite every time?