The Stratos artificial intelligence datacenter footprint will cover more than 40,000 acres (62 sq miles) over three sites in Box Elder county in north-western Utah. The facility will require about 9GW of power, which is more than the entire state of Utah currently consumes, and suck up a significant amount of water in an area that has been hit by severe drought in recent years.

  • The Picard Maneuver@lemmy.world
    link
    fedilink
    English
    arrow-up
    59
    ·
    15 hours ago

    That’s long-term thinking. I assume it’s like a ponzi scheme: everyone who puts money into something like this thinks they’ll cash out before the problems occur.

    Why do I feel like the ones left holding the bag are going to be the taxpayers/residents somehow?

    • belochka@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      edit-2
      4 hours ago

      If I were justifying my account name, I’d suppose, for the purpose of future appearing interesting, this might be a coverup.

      Such a structure is useful for many things, and while a DC doesn’t have to be that big, a factory producing real things on scale or mass housing or a prepared company town all benefit from being in one place.

      So perhaps it’s being built as a DC, but in fact is going to be like a drone factory, or something equally dystopian-futuristic.

      Or a humongous supercomputer, whatever.

      I’m starting to think along plot lines of science fiction and space operas I’ve seen and read before, they were saying it’s harmful for my development, I didn’t believe them.

      Another option - it’s, yes, a scheme and it won’t get built. Just pump and dump.